GEP APPs · the front-line layer

Value is not lost in the steering committee.
It is lost during the shift.

Three applications bring portfolio governance all the way to the workplace: the standard published where work is performed, its verification in the field, and the leadership routine that sustains it — using the same evidence seen by the board.

Schedule a 30-minute demo See the complete chain
33–42 %
of committed value
is lost in execution and sustainment
< 20 min
from zero to a QR code on the equipment
without an implementation project
No signal required
complete offline operation
sites with intermittent connectivity
V1 CURRENT
It is already in the pocket
of every operator
Place this code on the equipment. Anyone who scans it will always see the current version.
GEP-STD-0014 · V1
Lockout and tagging
SAFETY CRITICAL
Print
Created with GEP Standards
The blind spot

Value does not leak within a layer. It leaks at the handoffs.

Portfolio management suites provide rigorous governance but stop at the initiative level. Field applications digitize standards without connecting them to committed value. Between the two, evidence degrades on its way up and decisions fail to reach the front line.

Executive layer
Steering committee, portfolio, board
It knows what was committed, but cannot see how it is executed.
HANDOFF · VALUE LEAKS HERE
Management layer
Managers, Operational Excellence
It translates between both worlds — and reports through spreadsheets.
HANDOFF · VALUE LEAKS HERE
Front-line layer
Shift, supervisor, operator
Where value is actually created or lost.
The answer

Four tools. One continuous system.

All four share identity, organizational hierarchy, and a common data model. The client integrates nothing: the chain comes ready to use.

Field
Free
GEP Standards
The standard
Create and publish the work standard where it is performed.
Field
Free
GEP Confirmations
Verification
Verify in the field that the standard is being followed.
Leadership
Enterprise
Operating Model
The leadership routine
Schedule leadership routines and measure their discipline.
Governance
Instance
GEP Platform
Value governance
Govern the portfolio and protect committed value.
SDCA before PDCA. Standards standardizes, the shift executes, Confirmations verifies and the finding updates the standard. The transformation PDCA cycle runs on top of this operating cycle and is governed in GEP Platform. Without a standard there is no deviation; without deviation there is no management; without management there is no sustainment.
Application 1 · the standard
GEP Standards
In development
Field · free
“The current standard, in every operator’s pocket.”

Three standard formats —a TWI-structured SOP, an executable checklist, and a decision tree— created from a phone and published through a QR code. Without a documented standard there is no measurable deviation: Standards produces the asset every upper layer needs to discuss evidence rather than perceptions.

1
Three formats
A TWI-structured SOP, an executable checklist, and a decision tree for field diagnostics.
2
QR publishing
The code placed on the equipment always resolves to the current version. Unlimited access with no account required.
3
Works without a signal
Full access and execution in airplane mode, with synchronization when connectivity returns.
4
Creation assistant
Structures the supervisor’s dictation in TWI format and asks for missing technical data instead of making assumptions.
Its role in the chain
The asset no other tool produces
Each key point is stored classified as safety, quality, or technical, with a mandatory reason. It is not free text inside a PDF; it is structured data. This is what automatically generates the confirmation checklist in application 2.
Available as a free application on the App Store and Google Play.
My Standards
Alonso’s workspace · 13 total
Portfolio coverage
View details
15%
current
2 of 13 standards
2
Current
10
In editing
1
Overdue
Review “Tire replacement”
Review overdue by 24 days
All
SOP
Checklist
Decision tree
Published
2
Truck inspection
GEP-STD-0006 v1 current
SAFETY CRITICAL
Home
Explore
Academy
Profile
Coverage
V1 CURRENT
CRITICAL
Lockout and tagging
GEP-STD-0014 SOP · 4 steps 12 min
Steps
Edit
1
Disconnect power at the main panel
SAFETY
Verify zero voltage with the multimeter
Because the panel may retain a residual charge.
QUALITY
Record the lock number in the logbook
TECHNICAL
Turn the disconnect switch with the left hand
2
Install the personal lock and tag
1 SAFETY KEY POINT
Share QR
Published SOP
Application 2 · verification
GEP Confirmations
Next
Field · free
“The standard is written once and confirmed every day.”

In five minutes and offline, the leader verifies at the workplace that the standard is being followed. Each verification leaves auditable evidence instead of a notebook entry and produces observed adherence traceable by area, standard, and dimension.

1
The checklist generates itself
Each SOP key point becomes an observable condition, with its reason inherited as guidance for the person performing the confirmation.
2
Five minutes in the field
A field walk with three states per item: compliant, non-compliant, or not observed. Offline, with photographic evidence.
3
Observed adherence
Measured by area, standard, and dimension: safety, quality, and technical.
4
The finding returns to the standard
If the problem lies in the standard rather than its execution, a proposed new version is generated in application 1.
NON-NEGOTIABLE PRINCIPLE
Confirm the process; never evaluate the person
The data model does not allow the observed worker’s identity to be recorded. Only the confirming leader is recorded, because it is their own routine. This is a design constraint, not a usage policy — and it complies with Chilean Law 21,719.
Automatic checklist generation
ONE TAP
Key point in the SOP
SAFETY
Verify zero voltage with the multimeter
Because the panel may retain a residual charge.
Generated confirmation item
SAFETY · OBSERVABLE
Was zero voltage verified with the multimeter?
Guidance: the panel may retain a residual charge.
Compliant
Non-compliant
Not observed
The dimension is inherited from the key point. This enables segmented adherence by safety, quality, and technical criteria without any configuration.
The competitive moat
The checklist only generates itself if you created the standard
Automatic generation requires classified key points with their reasons. That only exists if the same suite built the standards application — no competitor without the TWI creation layer can replicate it.
Tool 3 · the leadership routine
Operating Model
In design
Leadership · enterprise
The leadership routine in your pocket, connected to governance.

Schedule leadership routines by hierarchical layer and measure their discipline. An enterprise product integrated with GEP Platform and its governance forums.

Layered scheduling
Cadences assigned across the organizational structure: daily for supervisors, weekly for managers, and monthly for executives.
Program completion
Routines completed over routines scheduled. This is the operating model’s discipline indicator.
Connected to governance
Integrated with GEP Platform, bringing front-line discipline into the steering committee discussion.
Why it is a separate tool rather than a Confirmations feature
Confirming a standard is something any supervisor can do on their own initiative. Scheduling layered routines requires a formal organizational structure, agreed cadences, and a steering committee accountable for discipline. That is the domain of the operating model — and governance.
The synergy

The evidence chain works in both directions

Each link references the previous one by its identifier, not by an interpretation.

Upward · from observation to decision
Standard key point
Confirmation checklist
Field confirmation
Observed adherence
Sustainment evidence
Value capture
Downward · from commitment to practice
Strategic objective
Portfolio initiative
Linked standard
QR code on the equipment
Shift operator
The steering committee discussion stops relying on statements and starts relying on evidence traceable to the workplace — while an executive decision reaches the shift without being lost in translation.
Measurement rigor

Three distinct metrics the market often conflates

Mixing them produces misleading metrics: 100% adherence with 20% program completion does not describe excellence; it describes a lack of observation.

Observed adherence
compliant items ÷ observed items
Is the standard followed at the workplace?
GEP Confirmations
Program completion
completed routines ÷ scheduled routines
Does leadership actually go to the field?
Operating Model
Value capture
verified benefit vs. committed value
Did the result reach the income statement?
GEP Platform
Adoption model

The suite enters through the front line, not the steering committee

The free applications support acquisition; conversion occurs when the organization needs governance capabilities, not when a usage quota runs out.

1
Individual
A supervisor adopts Standards
Free, with no project and no permission required. The supervisor publishes a first standard and places its QR code on the equipment.
2
Team
Operational Excellence confirms
Checklists are generated automatically from existing standards. The first adherence measurement by area appears.
3
Organization
The organization needs governance
Layered approvals, portfolio traceability, a routine program, and verifiable value capture.
Technical foundation

One architecture, four user experiences

Identity and access control
One user, one profile, and the same permissions across all four tools.
Organizational hierarchy
Site, area, line, station, and equipment: the same structure across the entire ecosystem.
Indicator catalog
Shared definitions and references, without reinterpretation by each tool.
Action engine and AI layer
One tracking mechanism and one assistant, governed by the same confidentiality rules.
Semantic consistency
An area is the same area across all four tools. No master-data reconciliation is required.
Near-zero marginal cost
Adding an application does not add infrastructure: they share a backend, database, and storage.
The client integrates nothing
The chain comes ready to use. There is no integration project across tools from different vendors.
Development status

What exists today and what comes next

GEP Platform
Functional core ready for deployment in a dedicated client instance.
Available
GEP Standards
Under active development, with scope finalized and architecture defined.
In development
GEP Confirmations
Scope designed on the technical foundation of Standards.
Next
Operating Model
Functional boundary defined. An enterprise product connected to Platform.
In design
On the horizon: expanding the indicator catalog across manufacturing and utilities, and extending the reference base for the Full Potential module.
Next step

GEP does not create the value of your
transformation. It protects it.

A tailored demo on demand. No generic presentation — only the problem your organization needs to solve.

Request a demo Explore GEP Platform